Allison-Antrim Museum 

                                     Greencastle, PA

Back
Topsoil
Blast
Excavating
Footers
Poured Walls
Stonework 1
Stonework 2

July 28, 2005
The Foundation BLAST!

40 to 50 loads of fill are hauled in to buffer the foundation blast.


About 340 holes are drilled into the bedrock.  The explosives are set and connected.


Video of the blast
(WMV Format, 360Kb, 30 sec)
top